Project Details
- Location Newark, CA
A previous client contacted Clear Creek about purchasing a third Chitosan Enhanced Sand Filtration system for an additional facility they operated. The third facility had similar industrial activities and similar raw water characteristics, but more stringent discharge requirements written into its stormwater permit. The client contacted Clear Creek again, and needed to know a similar system would work again in a different environment.
Clear Creek worked with the client, performing bench tests to show that results would be satisfactory and repeatable at the third facility. Clear Creek provided permitting assistance, engineering support, and design services for the third system. The client is happy with all CESF systems, and continues to see good discharge results at all facilities.
Services Provided
- Treatment System Design
- Infrastructure Coordination with Owner and Contractor
- Permitting Assistance
- Long-term O&M Assistance
Technology Provided
- Chemical Precipitation
- 200 gallons-per-minute
Project Statistics
4.1 - Acre Site
Discharge to Surface Waters
100% Compliance
Pollutants:
Turbidity, Cu and Zn