Project Details
- Location Perris Valley, CA
Provided, installed and operated treatment system for water collected from tunneling operations. Clear Creek Systems implemented a comprehensive water treatment solution designed to remove Total Suspended Solids (TSS), Neutralize pH, and remove PFAS for all produced water. Treated water was open discharged in compliance with all permits and specifications.

Services Provided
- Environmental Compliance with Metropolitan Water District (MWD) Requirements
- Treatment Design Capacity up to 1000 GPM
- 6,250,000 Gallons Treated
- Contractor – J.W. Fowler
- Owner: Metropolitan Water District of Southern California
Treated for
- Turbidity
- TSS
- pH
- PFOS
