Construction Stormwater Solutions

Hampton Road Bridge Tunnel – VA

Project Details Location: Hampton Roads, VA he existing tunnel from Hampton to Norfolk, Virginia at the mouth of the Chesapeake Bay was continually congested. The state built needed to build another tunnel next to it to help alleviate the situation. Each end of the tunnel required a treatment system. The treatment systems had to be …

Hampton Road Bridge Tunnel – VA Read More »

Residential Development Site

Project Details Location Washington State In fall of 2015, record rainfalls hit the Pacific Northwest causing many construction sites to flood with turbid stormwater runoff. Clear Creek Systems, Inc. responded to an emergency call at a construction project located in south-western Washington state. The project’s 3 million gallon stormwater retention vault was reaching capacity and …

Residential Development Site Read More »

Cal Memorial Stadium

Cal Memorial Stadium

Project Details Client Webcor Builders Location Berkeley, CA Renovations began on the Cal Memorial Stadium by Webcor Builders. During concrete curing operations, it became necessary to treat the water for pH adjustment. A separate system was needed to address storm water prior to discharge under the NPDES Construction General Permit. Treatment Clear Creek mobilized a …

Cal Memorial Stadium Read More »

Scroll to Top