Industrial Flushing

Hampton Road Bridge Tunnel – VA

Project Details Location: Hampton Roads, VA he existing tunnel from Hampton to Norfolk, Virginia at the mouth of the Chesapeake Bay was continually congested. The state built needed to build another tunnel next to it to help alleviate the situation. Each end of the tunnel required a treatment system. The treatment systems had to be …

Hampton Road Bridge Tunnel – VA Read More »

Data Center Flushing Project

Project Details Location Seattle, WA A large data center needed to complete flushing on a large expansion of new piping for their facilities cooling system. We worked with the customer to design a turnkey filtration system capable of running 24/7 and handling flows up 5,000 GPM. After flushing was complete the system had to continue …

Data Center Flushing Project Read More »

Semi Conductor Flushing Project

Project Details Location Seattle, WA A semi-conductor manufacturer needed to complete flushing on a large expansion of piping for their facility. We worked with the customer to design a turnkey filtration system capable of running 24/7 and handling flows up 15,000 GPM. The project was completed on time without any complications. Services Provided Turnkey System …

Semi Conductor Flushing Project Read More »