Industrial Stormwater Solutions

Marine Boatyard Stormwater

Project Details Client Marine Boatyard Operator Location Pierce County, WA Clear Creek received an urgent call from the facility representative. The facility needed to immediately install an industrial stormwater treatment system in order to mitigate terms of a third party Clean Water Act lawsuit. Clear Creek worked with the project engineer to develop an interim …

Marine Boatyard Stormwater Read More »

Marine Contractor Facility

Project Details Location Washington State A coastal Washington marine contractor received a third-party lawsuit for violations of the Clean Water Act (CWA). Clear Creek immediately deployed an interim Chitosan Enhanced Sand Filtration (CESF) system to treat stormwater runoff from the marine facility and storage yard. The temporary CESF system was also utilized as full scale …

Marine Contractor Facility Read More »

Marine Vessel Manufacturer

Project Details Location Tacoma, WA This small family business was very environmentally conscious and worked tirelessly to keep their facility clean. But even with proper BMP implementation and good housekeeping practices, the facility was unable to meet benchmarks for metals. Clear Creek was brought onto the project team to design a treatment solution that targeted …

Marine Vessel Manufacturer Read More »

Petrochemical Manufacturer

Project Details Client An Asphalt Manufacturer Location Tacoma, WA A Tacoma, WA manufacturer of asphalt sealant compounds faced industrial stormwater compliance challenges associated with the facility activities. Clear Creek conducted a comprehensive site evaluation to identify sources of elevated turbidity, copper and zinc. The site investigation revealed that heavy truck traffic associated with the export …

Petrochemical Manufacturer Read More »

Sand & Gravel Facility

Project Details Location Washington State The sand and gravel industry serves as a major supplier of aggregate, concrete and asphalt which supports the construction and maintenance of the nation’s civil infrastructure. The facility implemented a basic filtration system for treatment of stormwater runoff in 2002 however changes in permit requirements required the facility to consider …

Sand & Gravel Facility Read More »