Port Facilities

Shipyard PFAS Remediation

Project Details LocationSturgeon Bay, Wisconsin Clear Creek Systems designed and mobilized a 200 GPM PFAS temporary treatment system, for a project at a Wisconsin shipyard. The system was designed to treat for PFAS, PFOA, turbidity, TSS, and pH. The system was operational within a week of the project being awarded and has continued to meet …

Shipyard PFAS Remediation Read More »

Shipyard Water Treatment

Project Details Location San Diego, CA A major shipyard on the West Coast was having difficulty with meeting single digit part-per-billion levels for heavy metals in discharges of stormwater and hydrostatic relief water. Clear Creek conducted a low flow infield pilot test to screen applicable technologies and was awarded a design/build contract upon completion of …

Shipyard Water Treatment Read More »

Bulk Fueling Facility

Project Details Location Seattle, WA A bulk fueling facility contacted Clear Creek to assist with their stormwater discharges. The staff maintained a good BMP schedule and kept their site clean, but still had issues with elevated metals in their runoff. The facility was targeted by a citizen suit under the Clean Water Act, and had …

Bulk Fueling Facility Read More »

Marine Boatyard Stormwater

Project Details Client Marine Boatyard Operator Location Pierce County, WA Clear Creek received an urgent call from the facility representative. The facility needed to immediately install an industrial stormwater treatment system in order to mitigate terms of a third party Clean Water Act lawsuit. Clear Creek worked with the project engineer to develop an interim …

Marine Boatyard Stormwater Read More »

Marine Contractor Facility

Project Details Location Washington State A coastal Washington marine contractor received a third-party lawsuit for violations of the Clean Water Act (CWA). Clear Creek immediately deployed an interim Chitosan Enhanced Sand Filtration (CESF) system to treat stormwater runoff from the marine facility and storage yard. The temporary CESF system was also utilized as full scale …

Marine Contractor Facility Read More »

Marine Vessel Manufacturer

Project Details Location Tacoma, WA This small family business was very environmentally conscious and worked tirelessly to keep their facility clean. But even with proper BMP implementation and good housekeeping practices, the facility was unable to meet benchmarks for metals. Clear Creek was brought onto the project team to design a treatment solution that targeted …

Marine Vessel Manufacturer Read More »

Scroll to Top